,
All electrical work must be
carried out by a suitably qualified
electrician in accordance with local
and national safety regulations.
–
Connection should be made via a
suitable isolator, with an On/Off
switch that is easily accessible for
servicing work.
–
The electrical connection is made
through a receptacle according to
national requirements. The
receptacle has to be easily
accessible after installation.
– For technical data see the data plate
or wiring diagram supplied.
The machine must only be operated
with the voltage, frequency and fusing
shown on the data plate.
The machine can be converted
according to the supplied converting
diagram and wiring diagram.
The data plate is located at the rear of
the machine and behind the plinth on
the plastic cover.
The wiring diagram is supplied with the
machine.
See also the supplied installation
diagram.
A damaged power cord must only
be replaced with a genuine Miele
cord by a Miele service technician.
WARNING
THIS APPLIANCE MUST BE
GROUNDED
Grounding connection
The ground lead must be connected to
the screw connection point (marked
with the ground symbol 8) at the back
of the machine.
Electrical connection
68