Buhler 595 Washer User Manual


 
3
Pre-delivery Check List
Before delivering this equipment please complete the following check list.
1. The loader has been installed using the appropriate mounting kit for the tractor and loader.
2. The hydraulic system installed is appropriate for the tractor and loader
3. The loader is properly installed.
4. All bolts are tightened to the torque specifications shown in the torque chart.
5. All safety decals are readable.
6. The loader has been tested and operates properly.
7. The operator’s manual has been delivered to the owner who has been instructed on the safe and proper use
of the loader.
Dealer’s Signature_________________________________________________
This check list is to remain in this Owner’s Manual and is the responsibility of the dealer to complete it before
delivery to the customer.