EN
8
Removing packaging
reinforcement
Tilt the machine to remove the
packaging reinforcement. Remove the
packaging reinforcement by pulling the
ribbon.
Opening the transportation
locks
C Transportation safety bolts must
be removed before operating the
washingmachine!Otherwise,the
machine will be damaged!
1. Loosen all the bolts with a spanner
untiltheyrotatefreely(“C”)
2. Remove transportation safety bolts
by turning them gently.
3. Fitthecovers(suppliedinthebag
withtheOperationManual)intothe
holesontherearpanel.(“P”)
3 Installation
C Keepthetransportationsafety
bolts in a safe place to reuse when
the washing machine needs to be
moved again in the future.
C Never move the appliance without
the transportation safety bolts
properly fixed in place!
Appropriate installation
location
Install the appliance in environments
which have no risk of freezing, in a
stable and level position.
C The floor must be capable of
carrying the load on it!
C If the washing machine and a drier
are placed on top of each other,
their approximate weight together
may reach 180 kg when they are
full.
Important:
• Donotplacetheapplianceontopof
the power cable.
• Keepatleast1cmdistancefromthe
edges of other furniture.
• Placethemachineonafirmsurface;
do not position it on a long pile rug
or such like surfaces.
Adjusting the feet
C Do not use any tools to loosen the
locknuts.Otherwise,theycanbe
damaged.
1. Manually(byhand)loosenthelock
nuts on the feet.
2. Adjust them until the machine
stands level and firm.
3. Important:Tightenalllocknutsup
again.