A SERVICE OF

logo

INSTALLATION
Installation
1.
Remove the packaging
materials
and
tape
Remove all transportation packaging materials and
tape.
Open
the doors and ventilate the unit.
If
the outside panels are dirty, clean
them
with a diluted
neutral dishwashing detergent. (Undiluted detergent can damage the plastic components. For the
dilution, refer
to
the instruction
of
the detergent.) After cleaning with the diluted detergent, always wipe
it
off
with a wet cloth, then wipe the panels with a dry cloth.
2.
Door
handle installation Remove the two plugs from the door where
you
will attach the door handle.
Apply door handle, plastic washer and screw and fasten the screw. For floor-level installation, the handle
should
be
mounted at the higher location. For stacking above another compatible unit, the handle should be
mounted at the lower location.
3.
Ground (earth)
&WARNING
Use
a power
supply
outlet
with
ground
(earth) to prevent electric shock.
If
the power supply outlet is not
grounded, qualified personnel must install a ground.
Never
ground the
unit
through
a
gas
pipe,
water
main,
telephone
line
or
lightning
rod.
Such
grounding may cause electric shock in the case
of
an
incomplete circuit.
START-UP OF UNIT
The
following procedures should be adhered to for initial start-up and continuous operation.
1. Connect
the
unit to dedicated power supply. Do not put any product in
the
unit
at this time.
2. Set the desired temperature.
3.
Confirm that the chamber temperature is at the desired temperature.
4.
When
you
are satisfied that the unit is working correctly, begin slowly placing product into the chamber to
minimize the temperature rise.
13
English