A SERVICE OF

logo

111347-01B
For more information, visit www.desatech.com
For more information, visit www.desatech.com
13
13
Figure 18 - Rear Log
Placement (Variable
Manually-Controlled Models)
Figure 19 - Left and Right
Front Log Placement (Variable
Manually-Controlled Models)
INSTALLATION
Continued
WARNING: Failure to position the parts in accor-
dance with these diagrams or failure to use only parts
specifically approved with this heater may result in
property damage or personal injury.
CAUTION: After installation and periodically there-
after, check to ensure that no flame comes in contact
with any log. With the heater set to HI, check to see if
flames contact any log. If so, reposition logs accord-
ing to the log installation instructions in this manual.
Flames contacting logs will create soot.
INSTALLATION
Checking Gas Connections (Cont.)
Installing Logs
INSTALLING LOGS
Figure 16 - Checking Gas Joints (Propane/LP only)
Gas Control
Valve Location
Propane/LP
Supply Tank
Equipment Shutoff Valve
Figure 17 - Checking Gas Joints (Natural Gas Only)
Gas Meter
Gas Control
Valve Location
Equipment Shutoff Valve
It is very important to install the logs exactly as instructed. Do not
modify logs. Only use logs supplied with heater.
Variable Manually-Controlled Models (LSL)
1. Place rear log onto rear brackets making sure brackets fit into
recess on bottom of log (see Figure 18).
2. Place left front log on grate fingers as shown in Figure 19. Place
right front log on grate fingers and on left front log (see Figure 19).
3. Slide control cover log into position between two front logs as-
suring the cover log seats into cutout section (see Figure 20).
Figure 20 - Control Cover Log Placement (Variable Manually-
Controlled Models)
Rear Log
Left Front
Log
Right
Front Log
Cover Log
Left Front Log