A SERVICE OF

logo

Pumps & Conveying System Components Chapter 5: Maintenance 37
Chapter 5: Maintenance
5-1 Preventative Maintenance Schedule
The checklist below contains a list of items which should be inspected and/or replaced to
keep the mechanical components of your conveying system operating at peak efficiency.
Perform each inspection at the regular intervals listed below.
System model #
Serial #
Every week
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Inspect all filters for
wear, replace/
clean if dirty or
worn.
Check to make
sure that all hose
conections are
air tight.
Every month
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Lock out electrical
power and inspect
electrical wiring for
integrity.
Check demand
sensor.
Inspect gaskets at
hoppers.
Inspect belt(s).
Oil & grease
(lubricate)
components
- Photocopy this page for your maintenance records -