Installation
Unpacking
All transit bolts and packing must be removed before using the appli-
ance.
Using a spanner,
unscrew and
remove the 2 rear
bottom screws.
Slide out the 2
plastic pins. Lay
the machine on
its back, taking
care not to
squash the hoses.
This can be avoided by placing one of the
corner packing pieces between the machine
and the floor.
Remove the polystyrene block from the bot-
tom of the machine and release the two
plastic bags.
Carefully slide out the left-hand bag removing
it towards the right and then downwards.
Slide out the right-
hand bag removing
it towards the left
and then upwards.
Set the machine
upright and
remove the
remaining rear
screw. Slide out the
relevant pin.
49
P1129
P1124
2
3
1
P1126
P1127
P0001
P1128
132994040.qxd 1/22/03 9:16 AM Pagina 49 (Nero/Process Black pellicola)