Alliance Laundry Systems Drying Tumbler 110 Pound Capacity Part No. D0583 Clothes Dryer User Manual


 
Page 22
INSTRUCTIONS
1. Loosen bolts number one (1) through five (5).
2. Place pin “A” in position shown in figures 1 and 2.
3. Check pins “B” at position shown in figures 1 and 2 for
equal clearance.
4. If pin “B” clearance is unequal, adjust at nut #6.
5. When clearance at pin “B” is correct, tighten bolts #1 in the
following order, as viewed from rear of dryer, top right,
bottom left, top left and bottom right.
6. Tighten bolts #5 until flush against back of dryer. Tighten
lock nut #4 to secure bolt #5 in position.
7. Tighten bolts #2 and #3.
8. Remove pin “A” and check for proper clearance at points
“A” and “B”. If clearance is incorrect, repeat the above
steps.
NOTE
Use short sections of round steel rod for pins or drill bits may
be used in place of round rod.
INSTRUCTIONS FOR
ALIGNING BASKETS ON
110 LB. DRYERS
BASKET ALIGNMENT FOR DRYERS WITH TM200 GEAR REDUCER