ADC AD-115ES Clothes Dryer User Manual


 
10 American Dryer Corp. 113202-10
2. The V-belts are disconnected from the basket drive motor for shipping. Reconnect V-belts, using the
following instructions, before starting the dryer.
a. Remove hardware holding back (belt) guard and remove guard from dryer.
b. Lay one (1) belt into motor sheave (pulley) groove and wind belt into corresponding groove of the idler
pulley by rotating the idler pulley by hand. Rotate the idler pulley an extra turn or two (2) to ensure that
the belt is tracking properly in the motor sheave (pulley) and idler pulley grooves without twisting.
c. Repeat procedure to reconnect the remaining belt.
d. Replace back (belt) guard and hardware.
3. If more headroom is needed when moving dryer into position, the top console (module) may be removed,
using the following instructions.
a. Disconnect the ground wire (A) at the rear upper left hand corner of dryer.
b. Remove the eight (8) sets of nuts and washers (B) holding the console (module) to base.
c. Open the control door and control panel, and disconnect the white 15-pin plug connector (C) located in
the base of the control box.
d. Disconnect white plug connector located outside backside of the control box (provides power to heat
circuit).
e. Lift the console (module) off of the dryer base.
IMPORTANT: The dryer must be transported and handled in an upright position at ALL times.