– 42 –
Item Operation flow and applicable data, etc.
Heating operation
Zone A: The fan revolutions are
decreased by 100 rpm
every 20 seconds (to the
MIN revolutions).
When Zone A operation
continues for 5 minutes,
the compressor is stopped
and then restarted.
Zone B: The fan revolutions are
decreased by 100 rpm
every 20 seconds (to the
MIN revolutions).
Zone C: The fan revolutions are
decreased by 50 rpm
every 20 seconds (to the
MIN revolutions).
Zone D: The fan revolutions are
maintained at the current
revolutions.
Zone E: The fan revolutions are
increased by 50 rpm
every 20 seconds (to the
MAX revolutions).
Description
1) Operation is performed at the
MAX revolutions shown in the
left tables for 3 minutes after
compressor operation starts and
for 1 minute after defrosting
operation ends.
2) Following 1) above, operation is
performed at the outdoor unit fan
revolutions shown in the left
tables according to the outdoor
heatexchanger sensor (TE
sensor) temperature.
Zone A:
Zone B:
Zone C:
Zone D:
Zone E:
TE
24°C
21°C
18°C
15°C
A
-M14EAV-E
Com
ressor revolution
r
s
~
orma
o
erat
o
Fan revolution
IN MAX MI
A
I
MA
To>1
˚
7
5.5<To
10
50
0
5
00 25
75
-
<
o
.
T
-5
50 60
5
50 25
0
econ
operat
o
To>1
˚
5.5<To
10
50
0
5
00 25
70
-
<
o
.
7
T
-5
50 60
5
00 25
70
o
norm
7
To:outdoor sensor temp. (
˚
)
A
-M1
EAV-E
om
ressor revolution
r
s
~
orm
o
eratio
Fan revolution
IN MAX MI
A
I
MA
To>10
˚
5
5
5
7
.
<To
1
2
7
-5<
o
.
50 60
5
50 25
0
To
-
o
erat
o
To>10
˚
50
0
5
00 25
0
.
<To
1
7
-5<To
5.5
50 60
5
00 25
70
o
-
7
To i
norm
50
0
5
00 25
75
To:outdoor sensor temp.
˚