2.1. Receiving Inspection
Your instrument has been manufactured, calibrated, and carefully packed so it is ready for operation.
However, please inspect all items for any obvious signs of damage due to shipment. Immediately advise
Teledyne Hastings and the carrier if any damage is suspected.
Use the packing slip as a check list to ensure all parts are present (e.g. flow meter, power supply, cables
etc.) and that the options are correctly configured (output, range, gas, connector).
If a return is necessary, obtain an RMA (Return Material Authorization) number from Teledyne
Hastings’ Customer Service Department at 1-800-950-2468 or hastings_instruments@teledyne.com
.
2.2. Environmental and Gas Requirements
• Use the following guidelines prior to installing the flow meter:
• Ensure that the temperature of all components and gas supply are between -20° and 70° C
• Ensure that the gas line is free of debris and contamination
• Ensure that the gas is dry and filtered (water and debris may clog the meter and/or affect its
performance)
• If corrosive gases are used, purge ambient (moist) air from the gas lines
2.3. Mechanical Connections
The meter can be mounted in any orientation unless using dense gases or pressures higher than 250 psig
in which case a “flow horizontal” orientation is required. The meter’s measured flow direction is
indicated by the arrow on the electronics enclosure.
A straight run of tubing upstream or downstream is not necessary for proper operation of the meter. The
flow meter incorporates elements that pre-condition the flow profile before the measurement region. So
for example, an elbow may be installed upstream from the flow meter entrance port without affecting
the flow performance.
Compression fittings should be connected and secured according to recommended procedures for that
fitting. Two wrenches should be used when tightening fittings (as shown in the Quick Start Guide on
page iii) to avoid subjecting the flow meter body to undue torque and related stress.
The fittings are not intended to support the weight of the meter. For mechanical structural support,
four mounting holes (#1/4-20 thread, 3/8” depth) are located in the bottom of the meter. The position
of these holes is documented on the outline drawing in Appendix 3 (Section 6.3).
Leak-check all fittings according to an established procedure appropriate for the facility.