
Effective April, 1999
IL 33-DB6-1
Page 13
E. Install the rubber grommet in the existing
bottom slot in the right side of the Breaker
Frame.
F
or Kits Supplied with a Breaker Mounted
CPT Only.
Step 10: Installing the Breaker Mounted CPT
A. Temporarily align the CPT Mounting Bracket
with the existing holes in the left Breaker
Frame, as shown.
NOTE: On some models of DB-25 Breakers,
the hole used to mount the front of the CPT
Mounting Bracket may not be present. In
this case, use the CPT Mounting Bracket as
a template, then mark and drill a .219" hole
in the left Breaker Frame.
B. Align the CPT with the holes in the CPT
Mounting Bracket, as shown. Note that the side
of the CPT with four (4) terminals faces the āLā
side of the mounting bracket.
C. Secure the CPT to the Mounting Bracket
using the (2) .190-32 x .625 screws, (2)
.190-32 x .625 flat head screws, (6) flat
washers, (4) lock washers, and (4) nuts
supplied. Note that the screws are inserted
through the mounting bracket first, then
through the CPT. Also note that the flat head
screws are used in the holes nearest the long
leg of the mounting bracket.
D. Align then secure the CPT Assembly to the left
Breaker Frame, as shown, using the hardware
supplied: the (1) .250-20 x .750 bolt, (2) flat
washers, (1) lock washer, and (1) nut in the rear
hole; and the (1) .190-32 x 1.00 screw, (2) flat
washers, (1) lock washer, and (1) nut in the
front hole.