A SERVICE OF

logo

CROWN VERITY INC., 37 ADAMS BLVD., BRANTFORD, ON. CAN. N3S 7V8
TEL: (519) 751-1800 FAX: (519) 751-1802
www.crownverity.com
Email: info@crownverity.com
6
We hope that the information contained in this manual has helped you make some
informed decisions with respect to the location and dimensions of your structure. It is
imperative that all parties involved are aware of the limitations and requirements before
construction begins. Please consult with people “in the know” – fire department, building
inspectors, contractors, etc. They have a wealth of information and experience in these
areas and are the best people to consult with. If Crown Verity Inc. can be of any technical
assistance relating to the broiler itself, please don’t hesitate to call 519-751-1800.
Crown Verity Inc. can fabricate stainless steel access doors to your size requirements.
Please call for details and more information.
Final Installation Steps:
Once your support structure is complete and ready to accept the broiler unit, simply
slide/drop the unit into place. Do not fasten the broiler in any way. The unit should
remain removable from its supporting structure. Then have a gas technician make the
final hook-up to the gas supply.
Diagram #6
Cut-out dimensions
Models BI-30, BI-36, BI-48
“A”
TABLE
Dimension “A”
BI-30 30-3/4” min. - 31” max.
BI-36 37” min. - 37-1/4” max.
BI-48 48-3/4” min. - 49” max.
23” min.
23-1/4” max.
16” min.
16-1/4” max.