Whirlpool WGD9151X Clothes Dryer User Manual


 
Because Whirlpool Corporation policy includes a continuous commitment to improve Dimensions are for planning purposes only. For complete details, see Installation
our products, we reserve the right to change materials and specications without notice. Instructions packed with product. Specications subject to change without notice.
ELECTRICAL REQUIREMENTS
VENTING REQUIREMENTS
Exhaust venting: Exhaust your dryer to the outside. 4" (102 mm)
diameter vent is required. Rigid or exible metal exhaust vent
must be used. Do not use plastic or metal foil vet. Exhaust hood
must be at least 12" (305 mm) from the ground or any object that
may be in the path of the exhaust.
Determine vent length and elbows needed for best
drying performance:
Use following Vent System Chart to determine type of vent
material and hood combinations acceptable to use.
NOTE: Do not use vent runs longer than those specied
in Vent System Chart. Exhaust systems longer than those
specied will:
Shorten life of dryer.
Reduce performance, resulting in longer drying times
and increased energy usage.
Louvered Hood
Angled Hood
Box Hood
Exhaust hoods:
Recommended Styles:
Acceptable Style:
The dryer must be connected to the cold water faucet using new inlet hoses. Do not use old hoses. Do not overtighten.
Damage to the coupling can result.
A 120-volt, 60 Hz, AC-only, 15 or 20 amp fused electrical supply is required. A time-delay fuse or circuit breaker and a separate circuit
are recommended.
GAS SUPPLY REQUIREMENTS
Gas supply: This dryer is equipped for use with Natural gas. Dryer can be converted to L.P. gas. When rigid pipe is used it should be 1/2" IPS. When
acceptable to the gas supplier and local codes, 3/8" approved tubing may be used for lengths under 20 ft (6.1 m). For lengths over 20 ft (6.1 m), larger
tubing should be used. Pipe-joint compounds resistant to the action of L.P. gas must be used. An individual manual shutoff valve must be installed
within 6 ft (1.8 m) of the dryer in accordance with the National Fuel Gas Code ANSI Z223.1.
WATER (STEAM MODELS ONLY) REQUIREMENTS
Determine vent path:
Select route that will provide straightest and most direct
path outdoors.
Plan installation to use fewest number of elbows and turns.
When using elbows or making turns, allow as much room
as possible.
Bend vent gradually to avoid kinking.
Use as few 90° turns as possible.
INSTALLATION REQUIREMENTS
Standard Vent System Chart
Number of
90° elbows
Type
of vent
Box/louvered
hoods
Angled
hoods
1
4
3
2
0
Rigid metal
Rigid metal
Rigid metal
Rigid metal
Rigid metal
64 ft. (20 m)
54 ft. (16.5 m)
44 ft. (13.4 m)
35 ft. (10.7 m)
27 ft. (8.2 m)
58 ft. (17.7 m)
48 ft. (14.6 m)
38 ft. (11.6 m)
29 ft. (8.8 m)
21 ft. (6.4 m)
The “Vent System Charts” provide venting requirements that
will help achieve best drying performance.
NOTE: Side and bottom exhaust installations have a 90° turn
inside the dryer. To determine maximum exhaust length, add
one 90° turn to the chart.
Long Vent System Chart*
Number of
90° elbows
Type
of vent
Box/louvered
hoods
Angled
hoods
1
4
3
2
0
Rigid metal
Rigid metal
Rigid metal
Rigid metal
Rigid metal
130 ft. (39.6 m)
125 ft. (38.1 m)
115 ft. (35.1 m)
106 ft. (32.3 m)
98 ft. (29.9 m)
129 ft. (39.3 m)
119 ft. (36.3 m)
109 ft. (33.2 m)
100 ft. (30.5 m)
92 ft. (28.0 m)
*For Model WGD9051Y only.