4
INSTALLATION INSTRUCTIONS
Tools and Parts
Gather the required tools and parts before starting installation.
Read and follow the instructions provided with any tools listed
here.
Parts supplied:
Remove parts package from dryer drum. Check that all parts
were included.
4 leveling legs
Parts needed:
Check local codes. Check existing electrical supply and venting
and see “Electrical Requirements” and “Venting Requirements”
before purchasing parts.
Mobile home installations require metal exhaust system hardware
available for purchase from the dealer from whom you purchased
your dryer. For information on ordering, please refer to the
“Assistance or Service” section. You may also contact the dealer
from whom you purchased your dryer.
If using a power supply cord:
Use a UL listed power supply cord kit marked for use with
clothes dryers. The kit should contain:
■ A UL listed 30-amp power supply cord, rated 120/240 volt
minimum. The cord should be type SRD or SRDT and be at
least 4 ft (1.22 m) long. The wires that connect to the dryer
must end in ring terminals or spade terminals with upturned
ends.
■ A UL listed strain relief.
Location Requirements
You will need
■ A location that allows for proper exhaust installation. See
“Venting Requirements.”
■ A separate 30-amp circuit.
■ If you are using a power supply cord, a grounded electrical
outlet located within 2 ft (61 cm) of either side of the dryer.
See “Electrical Requirements.”
■ A sturdy floor to support the total weight (dryer and load) of
200 lbs (90.7 kg). The combined weight of a companion
appliance should also be considered.
■ A level floor with a maximum slope of 1" (2.5 cm) under entire
dryer.
Do not operate your dryer at temperatures below 45ºF (7ºC). At
lower temperatures, the dryer might not shut off at the end of an
automatic cycle. Drying times can be extended.
The dryer must not be installed or stored in an area where it will
be exposed to water and/or weather.
Check code requirements. Some codes limit, or do not permit,
installation of the dryer in garages, closets, mobile homes or
sleeping quarters. Contact your local building inspector.
Installation Clearances
The location must be large enough to allow the dryer door to
open fully.
Dryer Dimensions
*Most installations require a minimum 5" (12.7 cm) clearance
behind the dryer for the exhaust vent with elbow. See “Venting
Requirements.”
■ Flat-blade screwdriver
■ #2 Phillips screwdriver
■ Adjustable wrench that
opens to 1" (2.5 cm) or
hex-head socket wrench
(for adjusting dryer feet)
■ Wire stripper (direct wire
installations)
■ Tin snips (new vent
installations)
■ Level
■ Vent clamps
■ Caulking gun and
compound (for installing
new exhaust vent)
■ Tape measure
WARNING
Explosion Hazard
Keep flammable materials and vapors, such as
gasoline, away from dryer.
Place dryer at least 18 inches (46 cm) above the floor
for a garage installation.
Failure to do so can result in death, explosion, or fire.
43½"
(110.5 cm)
*29¼"
(74.3 cm)
22¼"
(56.5 cm)
29"
(73.7 cm)