Maytag MLG-45PDB Washer/Dryer User Manual


 
113489-3 (W10185535) Maytag Co. 11
Gas Information _______________________
Single-Phase Electrical Connection Leads
Black
=
L1
White
=
Neutral
Green
=
Ground
Insert the wiring from the two 120 volt 15 amp circuits (one for
top tumbler and one for bottom tumbler) into the strain reliefs.
Determine the top pocket electrical connections by checking
wire label, which will be marked “top”.
Connect wiring from 120 volt 15 amp circuit to top pocket
wiring as described in the following illustration (black to black,
white to white and green to chassis ground wire).
Connect wiring from 120 volt 15 amp circuit to remaining
wires (bottom pocket) as described in the following illustration
(black to black, white to white and green to chassis ground
wire).
Tighten strain relief screws assuring to leave a 1/2” of slack
in box.
Replace electrical box plate by inserting 3 screws previously
removed.
Input connection wiring must be sized properly to handle the
dryer’s current draw. This information is printed on the dryer’s
data label.
Type of Gas
This dryer is equipped for use with natural gas. It is design-
certified by CSA International for L.P. (propane and butane)
gases with appropriate conversion (L.P. kit 887168). No
attempt shall be made to convert the dryer from the gas
specified on the serial/rating plate for use with a different gas
without consulting the serving gas supplier. Conversion must
be done by a qualified service technician.
It is your responsibility to have all plumbing connections,
materials, and workmanship conform to local and state
regulations or codes of the country of destination. In the
absence of such codes, all plumbing connections, materials,
and workmanship must conform to the applicable local
requirements. In the USA this is the National Fuel Gas Code
ANSI Z223.1-LATEST EDITION, or in Canada, the Canadian
Installation Codes CAN/CGA-B149.1-M91 (Natural Gas) or
CAN/CGAB149.2-M91 (L.P. Gas) or LATEST EDITION.
It is important that gas pressure regulators meet applicable
pressure requirements, and that gas meters be rated for the
total amount of all the dryer Btu being supplied.
IMPORTANT: For ease of service, the individual gas supply
line of each dryer must have its own manual shutoff valve.
The dryer must be isolated from the gas supply piping
system by closing its individual manual shutoff valve
during any pressure test of the gas supply system at test
pressures equal to or less than 1/2 psig (3.5 kPa).
The dryer and its individual shutoff valve must be
disconnected from the gas supply piping system during any
pressure testing of that system at test pressures in excess
of 1/2 psig (3.5 kPa).
Failure to isolate or disconnect the dryer from supply as
noted can cause irreparable damage to the gas valve,
voiding the warranty.
NOTE: Undersized gas piping will result in ignition
problems, slow drying, and increased use of energy.
Explosion Hazard
Use a new CSA International approved gas supply
line.
Install a shutoff valve.
Securely tighten all gas connections.
Examples of a qualified person include:
licensed heating personnel,
authorized gas company personnel, and
authorized service personnel.
Failure to do so can result in death, explosion, or
fire.
WARNING
!