LG Electronics D3788W Clothes Dryer User Manual


 
15
Part 4 ELECTRICAL REQUIREMENTS FOR ELECTRIC DRYERS
4. Put the hooked shape ends of the wire under the
screw of the terminal block(hooked end facing
rightward) and squeeze the hook together and screw
tightly.
5. Put the hooked shaped ends of the other power
supply cable wires under the outer terminal block
screws(hooked end facing right) and squeeze the
hooked ends together and screw tightly.
6. Tighten strain relief screws.
7. Place the tab of terminal block cover into slot of
dryer rear panel. Make sure cover with screw.
Important : The places wherea 4-wire connection is
needed are mobile homes and areas that local codes
do not admit the use of 3-wire connections.
At least, 5ft(1.52m) of extra length is required for
dryer to be able to move.
Peel 5 in (12.7cm) of external covering from end
of cable, leaving bare ground wire at 5 in (12.7cm).
Cut 1
1
/2
in. (3.8cm) from 3 remaining wires. Strip
insulation back 1in. (2.5cm). Shape ends of wires
into a hook shape.
1. Take off center terminal block screw
2. Put the hooked end of the neutral wire(white) of
power supply cable under the center screw of
terminal block). Squeeze the hooked end together
3. Connect the hooked ends of the other power
supply cable to the center screw of terminal block.
4. Screw strain relief tightly.
5. Place tab of terminal block cover into slot of
dryer rear panel. Make sure cover with screw.
Then, put the hooked shape end of the wire under
the screw of the terminal block(hooked end facing
rightward) and pinch the hook together and screw
tightly.
3-wire connection : Direct wire
5"
(12.7 cm)
3
1
/
2
"
(8.6 cm)
1"
(2.5 cm)
5"
(12.7 cm)
1
"
1"
(2
.5
c
m
)
(2.5 cm)
3
V
3V2
"
(
8
.
9
c
m
)
(8.9 cm)
a. External ground connector
b. Neutral grounding wire (white)
c. Center silver-colored terminal block screw
d. Neutral wire (white or center wire)
e. 3/4 in. (1.9 cm) UL-listed strain relief
e
a
d
b
c