American Dryer Corp. AD-310 Phase 7 Clothes Dryer User Manual


 
23
b. Steam Dryers
The air line supply connection is made into the 1/8-inch N.P.T. tee which is located at the left hand side
of the top of the dryer. (Refer to the illustration below.)
2. Optional Compressed Air Components
A filter/regulator/gauge (F/R/G) assembly is supplied with the dryer only if the dryer was built with either the
optional sprinkler system or with the optional automatic (piston) operated loading doors.