American Dryer Corp. AD-310 Phase 7 Clothes Dryer User Manual


 
9
SECTION III
INSTALLATION PROCEDURES
Installation should be performed by competent technicians in accordance with local and state codes. In the
absence of these codes, the installation must conform to applicable American National Standards: ANSI Z223.
1-LATEST EDITION (National Fuel Gas Code) or ANSI/NFPA NO. 70-LATEST EDITION (National Electrical
Code) or in Canada, the installation must conform to applicable Canadian Standards: CAN/CGA-B149.1-M91
(Natural Gas) or CAN/CGA-B149.2-M91 (Liquid Propane [L.P.] Gas) or LATEST EDITION (for General
Installation and Gas Plumbing) or Canadian Electrical Codes Parts 1 and 2 CSA C22.1-1990 or LATEST EDITION
(for Electrical Connections).
A. REASSEMBLY OF DRYER
IMPORTANT: Always keep the basket (tumbler) section of the dryer in an upright position when
moving it.
The dryer may be shipped one (1) of two (2) ways; as a complete unit fully assembled and ready for hookup or
with the basket (tumbler)section separated from the base. If the dryer is shipped in two (2) pieces, the basket
(tumbler) section will have to be lifted onto the base. Use cables through the eyebolts on top of the basket
(tumbler) section, or use a forklift for the lifting process.