American Dryer Corp. AD-115 Clothes Dryer User Manual


 
13
3) Open the control door and control panel, and disconnect the white 15-pin plug connector (refer to C in the
illustration on the previous page (page 12) located in the base of the control box.
4) Disconnect white plug connector located outside backside of the control box (provides power to heat
circuit).
5) Lift the console (module) off of the dryer base.
IMPORTANT: The dryer must be transported and handled in an upright position at all times.
C. DRYER ENCLOSURE REQUIREMENTS
Even though a 12-inch clearance is acceptable, it is recommended that the rear of the dryer be positioned
approximately two (2) feet (24 inches) from the nearest obstruction (i.e., wall) for ease of installation,
maintenance, and service. Bulkheads and partitions should be made from noncombustible materials. The clear-
ance between the bulkhead header and the dryer must be a minimum of 4 inches and must not extend more
than 4-inches to the rear of the dryer front. The bulkhead facing must not be closed in all the way to the top of
the dryer. A 2-inch clearance is required.
NOTE: Bulkhead facing should not be installed until after dryer is in place. Ceiling area must be
located a minimum of 12 inches above the top of the dryer.
IMPORTANT: Even though a minimum of only 12-inches is required, 18-inches or more is suggested,
for steam dryers and especially in cases where sprinkler heads are over the dryers.