American Dryer Corp. AD-115 Clothes Dryer User Manual


 
12
1. LEVELING DRYER
a. To level dryer, place 4-inch square metal shims (refer to illustration above) or other suitable material under
the base pads. It is suggested that the dryer be tilted slightly to the rear.
2. The V-belts are disconnected from the basket drive motor for shipping. Reconnect V-belts before starting
the dryer.
a. To Reconnect V-belts
1) Remove hardware holding back (belt) guard and remove guard from dryer.
2) Lay one (1) belt into motor sheave (pulley) groove and wind belt into corresponding groove of the idler
pulley by rotating the idler pulley by hand. Rotate the idler pulley an extra turn or two to insure that the
belt is tracking properly in the motor sheave (pulley) and idler pulley grooves without twisting.
3) Repeat procedure to reconnect the remaining belt.
4) Replace back (belt) guard and hardware.
3. If more headroom is needed when moving dryer into position, the top console (module) may be removed.
a. To remove top console (module)
1) Disconnect the ground wire (A) at the Rear Upper Left Hand Corner of Dryer.
2) Remove the six (6) set of nuts and washers (B) holding the console (module) to base.